# Brief: A CRM to run Agile Cells: six pieces on tap, and the workflows in code

From: journalist@newsroom (writer-13, the newsroom.sgit.ai journalist), in the voice of Dinis Cruz, for Dinis Cruz. Date: 29 November 2026. Working id: crm-for-cells.

## The point

Six pieces of technology we already run, a CRM, email, digital twins, vaults, Markdown and git, and behaviour policies, now meet. Above them we can manage projects, teams and Agile Cells in a way people can see, with the workflows themselves written in code.

## Audience

People who manage projects and teams: project and programme managers, team leads, operations people, founders. Some have started using agents; most have used a CRM or a project tool. They know the pain: work scattered across tools, nobody can see the whole picture, and things go out that should not have. They are not developers, and they do not need to be.

What they doubt: that agents can be managed like a team, and that anyone can see what a team of agents is doing.

Who it is not for: engineers looking for the code (the article has more), and people looking for a CRM product review.

## Background

A project is contacts, messages, tasks and workflows: who is involved, what was said, what happens next and in what order. That is fundamentally a CRM. We have been building our own, by using it first on ourselves, because managing a fleet of agents is relationship management.

What changed is that six pieces we built or adopted separately are now on tap, and they meet. That is a Wardley map moment: when components evolve far enough, they become a base you build on, and where they intersect, something new becomes possible above them. Here, what becomes possible is the management of Agile Cells: small teams of agents set up for one job, many of them mini cells that last a few hours, borrowing agents from other teams, with one person thinking across them. Cells only scale if their communication does, and agents can do most of the work of keeping the record true: collecting, maintaining, synchronising.

The problem I have today is visibility. The setup is good, but it lives in repositories, sessions and Markdown files, and a person has to ask an agent to see it. A CRM is a view everyone already understands.

And the rule on top: the workflows go in code. Sending an email should not be left to an agent's judgement. It is a state machine: drafted by an agent, checked by code against the policy, approved and signed by a person, sent only by the gateway agent, recorded. There is no path from drafted to sent. We use AI to write the software, not to be the software, and that applies to our own processes too.

My words, 29 November 2026 (may be quoted, short): "the flow to send an email should almost be done in code"; "for them to scale, the communication needs to be very effective"; "the setup we have is really good. There's just not a lot of good visibility from it."

## Sources

- newsroom.sgit.ai, "A CRM to run Agile Cells" (29 November 2026): the six pieces, the map, visibility, the state machine.
- newsroom.sgit.ai, "A CRM for us and for our agents" (16 November 2026): build it by using it on ourselves; "Managing a fleet of agents is relationship management".
- newsroom.sgit.ai, "The email agentic cell" (16 November 2026): one gateway agent alone touches the mailbox; a twin in a vault; proposals on an append lane; policies at five altitudes.
- newsroom.sgit.ai, "Inside the Northstar twin" and "How a vault works": twins and vaults.
- newsroom.sgit.ai, "Three policies for an agent": the workflow policy, which steps run in what order.
- The studio's and account C's cells of 28 and 29 November 2026, as examples of mini cells (names only; no private data).

## Key messages

1. **A project is a CRM.** Contacts, messages, tasks and workflows.
2. **Six pieces now meet, so we can build above them.** CRM, email, twins, vaults, git, behaviour policies; the Wardley map.
3. **Cells scale only if their communication does, and agents keep the record true.**
4. **The missing piece is a view people can read.** The data is already there.
5. **The workflow is code, not a prompt.** The email state machine; no path that skips a state.

## Must say / must not say

- Must say: the six pieces by name, once each, each with a picture.
- Must say: "there is no path from drafted to sent", or the idea of it, over the state machine.
- Must say: that this is being built by using it on ourselves, and what is design versus done (the email cell is a design; the state machines are next).
- Must not: name a CRM vendor as worse, or review products.
- Must not: show real contacts, emails, names or messages, even blurred; draw them.
- Must not: claim the visibility problem is solved; the film shows where we are going.
- Must not: name the models behind the agents.
- Tone: practical, calm, a little excited about the map. British English, no em dashes.

## Script guidance (optional)

Horizontal first, about 2 minutes; then a vertical cut-down, about 75 seconds.

1. **The pain (10 s).** A person looking at scattered tools; then a cell of agents working, invisible. Voice: "What is a project? Who's involved, what was said, what happens next. That's a CRM."
2. **Six pieces (30 s).** Six tiles arrive one by one, each with a one-line job: CRM, email, digital twins, vaults, git, behaviour policies.
3. **The map (20 s).** The tiles slide right along an evolution axis and lock together into a base; above it, a cell lights up. Voice: "When pieces evolve far enough, you build on them. Where they meet, something new becomes possible."
4. **Cells (20 s).** Mini cells start, borrow agents, connect and fold into files; the record updates itself as agents collect and synchronise.
5. **The view (20 s).** The same cells redrawn as a CRM a person understands: agents as contacts, lanes as conversations, tasks, a pipeline.
6. **The workflow in code (20 s).** The email state machine, step by step; an agent tries to jump from drafted to sent and there is no arrow to take. Voice: "Agents write and read. Code moves the state."
7. **The line (10 s).** "We use AI to write the software, not to be the software. Even our own."

## Practical

- Format: horizontal first (websites, YouTube, LinkedIn), then vertical with safe_area.
- Length: horizontal about 2 minutes, at most 3; vertical about 75 s, at most 90.
- Publish on: newsroom.sgit.ai beside the article, YouTube, LinkedIn; the vertical on Instagram and Shorts, through the posting agent on my yes.
- Signs off: Dinis Cruz.
- Material: the article's map and state diagram as starting points, the studio's cells scenes, the three infographics of 29 November (one team, across accounts, six people).
- Reviews: synthetic viewers who manage projects and are not technical; loop until each can say back the six pieces and why the workflow is code.
